Order from just USD $5,000 · industry-low B2B entry point for chassis parts
Stabilizer Link — image coming soon
Manufacturer-direct Make-to-Order

SL-H060RCLHO-60

Stabilizer Link

For USA FIT 2007+
Brand: SLOOP
USD $5,000 unlocks global shipping
MOQ
1,000pcs
Lead Time
90–120 days
Request Quote
Reply within 24 h · or email quotes@sloopzone.com
ISO 9001 40-year manufacturer Ships globally

Vehicle Compatibility

Make Model Years Position Region
USA FIT 2007+ FRONT R Global

FAQ

Is this an original OEM part?

No. This is an aftermarket replacement manufactured by SLOOP, designed to meet OEM specifications. The OE number SL-H060RCLHO-60 is referenced under nominative fair use solely to identify vehicle compatibility — it does not imply licensing, endorsement, or affiliation with any vehicle manufacturer. For genuine OEM parts, contact your authorized dealer.

How do I confirm this part matches OE SL-H060RCLHO-60?

Form-fit-function tested against the OEM specification. Material test reports and dimensional drawings are sent with every quote. For high-volume orders we will produce a sample-grade pre-production unit for your QC team's verification before main run.

What is your minimum order for this item?

This is a made-to-order item. Minimum order is 1,000 pcs (one production batch). The USD 5,000 minimum order value is automatically satisfied because 1,000 pcs × unit price already exceeds it.

You can combine this MTO batch with any in-stock items in the same order at no extra logistics cost.

What certifications and quality standards do you carry?

ISO 9001:2015 quality management, plus REACH / RoHS for EU compliance. Material test reports and PPAP documentation are available on request for tier-1 buyers. Certificates ship with first shipment of every new SKU.

Do you offer samples?

No free samples. Your first order doubles as the qualification batch. We hold the production run until you confirm visual + dimensional inspection from the first carton. If anything is out of spec we re-make at our cost.

Payment terms?

100% T/T (bank wire) before production start. USD only. Bank details and proforma invoice are sent after you accept the quote. No credit terms, no Letters of Credit on first order.

Lead time and shipping?

Production: 90–120 days from confirmed payment. Air freight (DHL / FedEx, door-to-door tracked) 5–7 days. Sea freight 25–40 days depending on destination port. We can quote FOB Taiwan or DDP your warehouse.

Warranty?

12-month manufacturer warranty against material and workmanship defects, from date of shipment. Defective units replaced or credited at our discretion. Wear items (rubber boots, etc.) excluded after first installation.

Custom packaging or private label?

Yes for orders 1,000+ units per SKU. Provide your label artwork (AI / EPS), barcode (UPC / EAN), and box specification. One-time setup fee may apply for the first run.

What if I need a part you do not list?

Upload your full parts inquiry on the quote page. We match every line we carry and flag the rest for our manufacturing roadmap. Aggregated inquiries directly drive our next production batch.

Get Quote Email