Order from just USD $5,000 · industry-low B2B entry point for chassis parts
Stabilizer Link — image coming soon
Manufacturer-direct Make-to-Order

4056A112

Stabilizer Link

For
  • Pajero 1999
  • Montero 2006
Brand: SLOOP
USD $5,000 unlocks global shipping
MOQ
1,000pcs
Lead Time
90–120 days
Request Quote
Reply within 24 h · or email quotes@sloopzone.com
ISO 9001 40-year manufacturer Ships globally

Vehicle Compatibility

Brand Car Name Model Year Position
Pajero 1999 REAR R
Montero 2006 REAR R
About Stabilizer Links

Short connecting rod that links the anti-roll (sway) bar to the strut or control arm.

What it does

Transfers body-roll forces from one side of the suspension to the anti-roll bar, which then resists the roll by transferring some load to the opposite wheel.

Common failure symptoms

  • Rattling or clunking from front suspension over bumps
  • Excessive body roll in corners
  • Loose / floaty handling feel

Where it sits in the steering / suspension

Both ends of the front (and often rear) anti-roll bar — typically two per axle.

FAQ

Is this an original OEM part?

No. This is an aftermarket replacement manufactured by SLOOP, designed to meet OEM specifications. The OE number 4056A112 is referenced under nominative fair use solely to identify vehicle compatibility — it does not imply licensing, endorsement, or affiliation with any vehicle manufacturer. For genuine OEM parts, contact your authorized dealer.

How do I confirm this part matches OE 4056A112?

Form-fit-function tested against the OEM specification. Material test reports and dimensional drawings are sent with every quote. For high-volume orders we will produce a sample-grade pre-production unit for your QC team's verification before main run.

What certifications and quality standards do you carry?

ISO 9001:2015 quality management, plus REACH / RoHS for EU compliance. Material test reports and PPAP documentation are available on request for tier-1 buyers. Certificates ship with first shipment of every new SKU.

Do you offer samples?

No free samples. Your first order doubles as the qualification batch. We hold the production run until you confirm visual + dimensional inspection from the first carton. If anything is out of spec we re-make at our cost.

Payment terms?

100% T/T (bank wire) before production start. USD only. Bank details and proforma invoice are sent after you accept the quote. No credit terms, no Letters of Credit on first order.

Lead time and shipping?

Production: 90–120 days from confirmed payment. Air freight (DHL / FedEx, door-to-door tracked) 5–7 days. Sea freight 25–40 days depending on destination port. We can quote FOB Taiwan or DDP your warehouse.

What if I need a part you do not list?

Upload your full parts inquiry on the quote page. We match every line we carry and flag the rest for our manufacturing roadmap. Aggregated inquiries directly drive our next production batch.

Get Quote Email