Order from USD 5,000 · ships globally from Taiwan
Chassis Xref — image coming soon
Manufacturer-direct Make-to-Order

48521-AG085

Chassis Xref

For NISSAN MURANO

USD $5,000 unlocks global shipping
MOQ
1,000pcs
Lead Time
90–120 days
Request Quote
Reply within 24 h · or email sloopweb@ms76.hinet.net
ISO 9001 Taiwan since 1984 Ships globally

Quick Answer

48521-AG085 is a SLOOP aftermarket Chassis Xref. It fits Nissan Murano. The page is intended for B2B replacement-part sourcing and uses the OE number only to identify vehicle compatibility. This item is made to order with a 1,000 pcs/SKU minimum. Standard production or dispatch lead time is 90–120 days, with global shipping from Taiwan.

OE number
48521-AG085
Part
Chassis Xref
Fitment
Nissan Murano
Supply
Make to order / 1,000 pcs MOQ / 90–120 days

Vehicle Fitment

Year Make Model Position
Nissan Murano

Related Parts

FAQ

Is this an original NISSAN OEM part?

No. This is an aftermarket replacement manufactured by SLOOP, designed to meet OEM specifications. The OE number 48521-AG085 is referenced under nominative fair use solely to identify vehicle compatibility — it does not imply licensing, endorsement, or affiliation with any vehicle manufacturer.

How do I confirm this part matches OE 48521-AG085?

Form-fit-function tested against the OEM specification. Material test reports and dimensional drawings are sent with every quote. For high-volume orders we will produce a sample-grade pre-production unit for your QC team's verification before main run.

What certifications and quality standards do you carry?

ISO 9001:2015 quality management, plus REACH / RoHS for EU compliance. Material test reports and PPAP documentation are available on request for tier-1 buyers. Certificates ship with first shipment of every new SKU.

Do you offer samples?

No free samples. Your first order doubles as the qualification batch. We hold the production run until you confirm visual + dimensional inspection from the first carton. If anything is out of spec we re-make at our cost.

Payment terms?

100% T/T (bank wire) before production start. USD only. Bank details and proforma invoice are sent after you accept the quote. No credit terms, no Letters of Credit on first order.

Lead time and shipping?

Production: 90–120 days from confirmed payment. Sea freight 25–40 days from Taiwan port (most common). Air freight available on request for urgent orders. We can quote FOB Taiwan or DDP your warehouse.

What if I need a part you do not list?

Upload your full parts inquiry on the quote page. We match every line we carry and flag the rest for our manufacturing roadmap. Aggregated inquiries directly drive our next production batch.

Get Quote Email